Skip to main content
SciDev
Rum Jungle Construction

Mining

Rum Jungle Mine Remediation

SciDev has been awarded the design and construction of the Groundwater Treatment Plant Package by McMahon Services Australia (NT) Pty Ltd (McMahon Services), for the Department of Mining and Energy’s Rum Jungle Rehabilitation Project, located just south of Darwin in Batchelor.

The contract, valued at approximately $19.5 million, covers the design and construction of a 30-litre-per-second multi-stage groundwater treatment plant to treat contaminated groundwater from legacy uranium mining at the former Rum Jungle Mine. As one of Australia’s most significant environmental remediation undertakings, the project will rehabilitate the former Rum Jungle Uranium Mines – paving the way for the land’s return to its Traditional Owners, the Kungarakan and Warai peoples.

The rehabilitation work will treat mine pit water and groundwater, building on past efforts and applying industry-leading methods to:

  • halt acid metalliferous drainage
  • isolate radiological hazards
  • reconstruct stable, enduring landforms.

Related solutions

Solutions used on this project

More projects

  • Hydra-IQ Case Study

    Mining

    Hydra-IQ™

    Reducing operating costs with Hydra-IQ™

    The deployment of HydraIQ™ revolutionised a mining company’s water monitoring approach, switching from manual sampling to automated, real-time monitoring.

Talk to our team

Tell us about your site and we'll route your enquiry to the right engineer.

Contact us

Download this resource

Enter your details below and we'll take you straight to the download.

Fields marked with an asterisk (*) are required.