Camellia Remediation
Temporary water treatment plant to remove hexavalent chromium and other metals from surface water at Camellia, NSW.
Case studies
Real projects where our engineering, chemistry and data platform solve meaningful, water-centric challenges.
Industry
Solution

Infrastructure
PFAS & Remediation, Dewatering +2 more
Temporary water treatment plant to remove hexavalent chromium and other metals from surface water at Camellia, NSW.

Energy
Clay Control
CatChek®-treated wells show 51% higher BOE production at three months and 42% more over a year than untreated wells.

Infrastructure
Reuse & Treatment
Plant treating up to 530m³ of groundwater a day near Sydney Park's old legacy landfills, discharging clean water to the environment to the ANZECC 95th percentile level of ecological protection.

Infrastructure
PFAS & Remediation
FluorofIX™ implemented for continuous discharge, removing PFAS and oxidisable precursors from contaminated ground and surface water at former CFA training site.

Infrastructure
PFAS & Remediation
Temporary water treatment plant that treated 6.9 megalitres of PFAS-impacted water without a single media replacement, alongside capping works remediating two of the site's three retention dams.

Mining
PFAS & Remediation
The only PFAS water treatment plant of its scale in Australia treating beneath the 99th percentile level of ecological protection.

Infrastructure
Reuse & Treatment
A remotely monitored temporary water treatment plant producing 2.5 megalitres a day, built to treat high levels of iron and manganese with minimal on-site operator input.

Infrastructure
PFAS & Remediation, Reuse & Treatment +2 more
Temporary water treatment plant dewatering a 5,485m² basement excavation, treating contaminated groundwater through a three-stage process so basement construction could proceed safely.

Mining
Hydra-IQ™
The deployment of HydraIQ™ revolutionised a mining company’s water monitoring approach, switching from manual sampling to automated, real-time monitoring.

Mining
Reuse & Treatment
$19.5 million contract to design and construct a 30 litre pre second multi-stage water treatment plant to remediate contaminated groundwater from legacy uranium mining at the former Rum Jungle Mine.

Infrastructure
PFAS & Remediation, Coagulants +1 more
A batch treatment plant has treated over 4.4ML of PFAS, hydrocarbon and oil-contaminated wastewater at Rutherford — a remotely monitored, cost-effective off-site solution.

Infrastructure
PFAS & Remediation, Reuse & Treatment +1 more
Permanent leachate treatment plant to treat leachate from the former Tempe Tip landfill, autonomously scaling capacity during heavy rainfall to keep the Sydney Gateway project on track.

Infrastructure
Flocculants, Reuse & Treatment
ClariVie44® cut coagulant dosage at the thickener to zero, reducing flocculant consumption and make-up water demand while lifting overflow water quality.

Infrastructure
Reuse & Treatment, Dewatering +1 more
Two automated water treatment plants keep tunnelling works moving 24/7 — treating construction water so it can be reused on site instead of trucked away.

Infrastructure
PFAS & Remediation
PFAS water treatment plant mobilised and fully operational within four business days, capturing and treating stormwater run-off so works could continue through heavy rain.