Real projects where our engineering, chemistry and data platform solve meaningful, water-centric challenges.

Filter projects

Industry

Solution

Projects

  • Camellia BOO

    Infrastructure

    PFAS & Remediation, Dewatering +2 more

    Camellia Remediation

    Temporary water treatment plant to remove hexavalent chromium and other metals from surface water at Camellia, NSW.

  • Erskineville Water Treatment Plant

    Infrastructure

    Reuse & Treatment

    Erskineville Water Treatment Plant

    Plant treating up to 530m³ of groundwater a day near Sydney Park's old legacy landfills, discharging clean water to the environment to the ANZECC 95th percentile level of ecological protection.

  • Fiskville PFAS

    Infrastructure

    PFAS & Remediation

    Fiskville PFAS Water Treatment Plant

    FluorofIX™ implemented for continuous discharge, removing PFAS and oxidisable precursors from contaminated ground and surface water at former CFA training site.

  • Londonderry PFAS

    Infrastructure

    PFAS & Remediation

    Londonderry PFAS Treatment & Capping Works

    Temporary water treatment plant that treated 6.9 megalitres of PFAS-impacted water without a single media replacement, alongside capping works remediating two of the site's three retention dams.

  • Narromine Temporary Water Treatment Plant

    Infrastructure

    Reuse & Treatment

    Narromine Temporary Water Treatment Plant

    A remotely monitored temporary water treatment plant producing 2.5 megalitres a day, built to treat high levels of iron and manganese with minimal on-site operator input.

  • Newmarket Temporary Water Treatment Plant

    Infrastructure

    PFAS & Remediation, Reuse & Treatment +2 more

    Newmarket Temporary Water Treatment Plant

    Temporary water treatment plant dewatering a 5,485m² basement excavation, treating contaminated groundwater through a three-stage process so basement construction could proceed safely.

  • Hydra-IQ Case Study

    Mining

    Hydra-IQ™

    Reducing operating costs with Hydra-IQ™

    The deployment of HydraIQ™ revolutionised a mining company’s water monitoring approach, switching from manual sampling to automated, real-time monitoring.

  • Rum Jungle Construction

    Mining

    Reuse & Treatment

    Rum Jungle Mine Remediation

    $19.5 million contract to design and construct a 30 litre pre second multi-stage water treatment plant to remediate contaminated groundwater from legacy uranium mining at the former Rum Jungle Mine.

  • Rutherford PFAS Treatment

    Infrastructure

    PFAS & Remediation, Coagulants +1 more

    Rutherford PFAS Contaminated Groundwater Treatment

    A batch treatment plant has treated over 4.4ML of PFAS, hydrocarbon and oil-contaminated wastewater at Rutherford — a remotely monitored, cost-effective off-site solution.

  • Gateway Permanent Leachate Treatment Plant

    Infrastructure

    PFAS & Remediation, Reuse & Treatment +1 more

    Sydney Gateway Permanent Leachate Treatment Plant

    Permanent leachate treatment plant to treat leachate from the former Tempe Tip landfill, autonomously scaling capacity during heavy rainfall to keep the Sydney Gateway project on track.

  • Victoria Wastewater Treatment with ClariVie44

    Infrastructure

    Flocculants, Reuse & Treatment

    Victoria Wastewater Treatment with ClariVie44

    ClariVie44® cut coagulant dosage at the thickener to zero, reducing flocculant consumption and make-up water demand while lifting overflow water quality.

  • Western Harbour Tunnel Water Treatment Plant

    Infrastructure

    Reuse & Treatment, Dewatering +1 more

    Western Harbour Tunnel Water Treatment Plant

    Two automated water treatment plants keep tunnelling works moving 24/7 — treating construction water so it can be reused on site instead of trucked away.

  • Woolworths PFAS Moorebank

    Infrastructure

    PFAS & Remediation

    Woolworths Moorebank PFAS Treatment

    PFAS water treatment plant mobilised and fully operational within four business days, capturing and treating stormwater run-off so works could continue through heavy rain.