Infrastructure
Fiskville PFAS Water Treatment Plant
The remediation of the former Country Fire Authority (CFA) Victorian Emergency Management Training Centre at Fiskville was one of Australia’s most significant PFAS (per- and poly-fluoroalkyl substances) remediation projects at the time.
Historical fire-fighting training activities at the 150-hectare site involved the use of aqueous film-forming foams (AFFF), now known to be a primary source of PFAS contamination in soil and groundwater at similar sites across the world.
In partnership with Ventia, SciDev designed, constructed, commissioned, and operated an innovative pfas water treatment plant (WTP) that received Victorian Environmental Protection Agency (EPA) approval to discharge treated water continuously back to the environment.
Approval for continuous discharge of treated water was contingent on strict ongoing sampling frequency and a comprehensive proof of performance period being completed prior to receiving discharge approval.
Summary
- 684,000: Maximum litres treated per day, a 37% increase in the system design flow rate.
- Over 80,000,000: Litres successfully treated in full compliance with EPA licence over the project.
- Cost Savings: Additional volume processed without need for anion ion exchange resin replacement or regeneration, demonstrating the PFAS holding capacity of FluorofIX™.
- 0.0054%: Waste generation
- 8: Water treatment Processes
Outcomes
Results
37% increase
In the system design flow rate to 684,000 maximum litres treated per day
80,000,000+ litres
Treated in full compliance with EPA licence over the life of project
0.0054%
Minimal waste generation
Related solutions
Solutions used on this project
More projects
Related projects

Infrastructure
PFAS & Remediation, Dewatering +2 more
Camellia Remediation
Temporary water treatment plant to remove hexavalent chromium and other metals from surface water at Camellia, NSW.

Infrastructure
Reuse & Treatment
Erskineville Water Treatment Plant
Plant treating up to 530m³ of groundwater a day near Sydney Park's old legacy landfills, discharging clean water to the environment to the ANZECC 95th percentile level of ecological protection.

Infrastructure
PFAS & Remediation
Londonderry PFAS Treatment & Capping Works
Temporary water treatment plant that treated 6.9 megalitres of PFAS-impacted water without a single media replacement, alongside capping works remediating two of the site's three retention dams.
Talk to our team
Tell us about your site and we'll route your enquiry to the right engineer.