Infrastructure
Camellia Remediation
The Camellia precinct — associated with the Parramatta Light Rail project — required management of surface water contamination from past industrial processes. SciDev designed, constructed and operated a temporary water treatment plant (TWTP) that removed hexavalent chromium and other metals from surface water on site, treating it down to a non-detect limit of reporting and discharging the water to sewer in accordance with the client's trade waste agreement.
Summary
- Design, construct, and commission a TWTP capable of treating up to 200 m3 of contaminated water in a 24-hour period.
- Coagulation, flocculation, and reduction were used for pre-treatment prior to the dewatering and filtration stages.
- The temporary water treatment plant treated over 39ML of water contaminated with total chromium levels as high 4.2mg/L and hexavalent chromium as high as 2.46mg/L.
- TWTP generated 6m3 of restricted solid waste (RSW), equating to 0.0154% of the total volume processed. This waste was sent to an appropriately licensed landfill and no waste required thermal treatment.
- Highest volume treated in a day was 272.3m3, an increase of 36% in the system design flow rate.
- Discharge to trade waste below the limit of reporting: total hexavalent chromium <0.001mg/L.
- Total of 3ML of sludge was dewatered and treated across the project’s lifetime.
Outcomes
Results
200m³/24hrs
Temporary water treatment plant designed, constructed and commissioned to treat up to 200m³ of contaminated water in a 24-hour period.
36% improvement
Peak volume of 272 m3 treated in a day, 36% higher than the system design flow rate.
Over 39ML
Treated over 39ML of water contaminated with total chromium levels up to 4.2mg/L and hexavalent chromium up to 2.46mg/L
More projects
Related projects

Infrastructure
Reuse & Treatment
Erskineville Water Treatment Plant
Plant treating up to 530m³ of groundwater a day near Sydney Park's old legacy landfills, discharging clean water to the environment to the ANZECC 95th percentile level of ecological protection.

Infrastructure
PFAS & Remediation
Fiskville PFAS Water Treatment Plant
FluorofIX™ implemented for continuous discharge, removing PFAS and oxidisable precursors from contaminated ground and surface water at former CFA training site.

Infrastructure
PFAS & Remediation
Londonderry PFAS Treatment & Capping Works
Temporary water treatment plant that treated 6.9 megalitres of PFAS-impacted water without a single media replacement, alongside capping works remediating two of the site's three retention dams.
Talk to our team