Skip to main content
SciDev
Narromine Temporary Water Treatment Plant

Infrastructure

Narromine Temporary Water Treatment Plant

40km west of Dubbo, the rural Australian town of Narromine has been facing water security issues for several years. The reservoirs in the region are at critical levels, and several new bores have shown high concentrations of iron and manganese. In 2012, Narromine Shire drilled several new bores to address the ongoing drought, but the water from these new bores contained high levels of iron and manganese. This case study aims to explore how a water treatment plant can be implemented in a rural setting to minimize labour, chemical consumption, and waste production while maximising output, especially during drought relief efforts.

In 2019, Narromine Shire council engaged SciDev to design and construct a temporary water treatment plant capable of producing 2.5 megalitres of water per day. Due to the rural location of the facility, the design needed to incorporate a system that requires minimal operator input and can be remotely monitored and controlled.

Summary

  • Design and construct a temporary water treatment plant capable of producing 2.5 megalitres of water per day.
  • Treating high levels of iron and manganese.
  • Due to the rural location of the facility, the design needed to incorporate a system that requires minimal operator input and can be remotely monitored and controlled.
  • The existing plant includes a standalone chlorination plant, which can treat the shallow bores.
  • The temporary water treatment plant introduced the use of ozone for the advanced oxidation of dissolved metals, along with a modified filtration media capable of targeting the contaminants.

Outcomes

Results

  • 2.5ML/day

    Water treatment plant designed and constructed to produce 2.5 megalitres of water per day

Related solutions

Solutions used on this project

More projects

  • Camellia BOO

    Infrastructure

    PFAS & Remediation, Dewatering +2 more

    Camellia Remediation

    Temporary water treatment plant to remove hexavalent chromium and other metals from surface water at Camellia, NSW.

  • Erskineville Water Treatment Plant

    Infrastructure

    Reuse & Treatment

    Erskineville Water Treatment Plant

    Plant treating up to 530m³ of groundwater a day near Sydney Park's old legacy landfills, discharging clean water to the environment to the ANZECC 95th percentile level of ecological protection.

  • Fiskville PFAS

    Infrastructure

    PFAS & Remediation

    Fiskville PFAS Water Treatment Plant

    FluorofIX™ implemented for continuous discharge, removing PFAS and oxidisable precursors from contaminated ground and surface water at former CFA training site.

Talk to our team

Tell us about your site and we'll route your enquiry to the right engineer.

Contact us

Download this resource

Enter your details below and we'll take you straight to the download.

Fields marked with an asterisk (*) are required.