Temporary and permanent treatment options
[DRAFT — pending Marketing approval] From temporary water treatment plants through to permanent installations, matched to project timeframes.
WATER SOLUTIONS
[DRAFT — pending Marketing approval] Advanced treatment for water reuse at scale.
[DRAFT — pending Marketing approval] SciDev delivers end-to-end water reuse and treatment solutions for construction, infrastructure and industrial clients — from temporary water treatment plants through to permanent installations.
[DRAFT — pending Marketing approval] Treatment trains are engineered around the intended reuse and each project's discharge requirements, supported across the full project lifecycle rather than as a one-off installation.
Key benefits
[DRAFT — pending Marketing approval] From temporary water treatment plants through to permanent installations, matched to project timeframes.
[DRAFT — pending Marketing approval] Delivered on major construction and infrastructure projects — see the case studies below.
[DRAFT — pending Marketing approval] Support spans design, installation, operation and decommissioning as project needs change.
[DRAFT — pending Marketing approval] Treatment trains are engineered to meet applicable discharge standards for each site.
Case studies

Mining
$19.5 million contract to design and construct a 30 litre pre second multi-stage water treatment plant to remediate contaminated groundwater from legacy uranium mining at the former Rum Jungle Mine.

Infrastructure
Plant treating up to 530m³ of groundwater a day near Sydney Park's old legacy landfills, discharging clean water to the environment to the ANZECC 95th percentile level of ecological protection.

Infrastructure
A remotely monitored temporary water treatment plant producing 2.5 megalitres a day, built to treat high levels of iron and manganese with minimal on-site operator input.